Tsugami BW 12-III

The BW12-II uses its 3-path control system and dual independent gang slides to slash cycle time and produce complex parts quickly. Multiple driven tool positions on the main and sub spindle combined with front and rear tool posts enable multiple simultaneous and/or overlapping operations.&lt;br /&gt;&lt;br /&gt;&lt;!–mep-nl–&gt;&lt;!–mep-nl–&gt;Cycle time is dramatically reduced by simultaneous rough and finish OD turning, and also with simultaneous 2-face end-milling with cross rotary tools. The front and rear tool posts also perform overlapping machining, independent back side machining, simultaneous end-milling and balanced turning.&lt;br /&gt;&lt;br /&gt;&lt;img src=”http://screwmatics.com/wp-content/uploads/2014/07/BW121.jpg” alt=”BW12[1]” width=”1024″ height=”964″ class=”aligncenter size-full wp-image-735″ /&gt;&lt;br /&gt;&lt;!–mep-nl–&gt;&lt;!–mep-nl–&gt;&lt;br /&gt;&lt;strong&gt;Key Advantages Include:&lt;/strong&gt;&lt;br /&gt;&lt;ul&gt;&lt;li&gt;Two Gang Type Tool Posts on Independent Slides enables independent back side machining, simultaneous end-milling and balanced turning with fron/rear posts&lt;/li&gt;&lt;li&gt;Simultaneous 3-Path System control enables overlapping simultanous machining&lt;/li&gt;&lt;li&gt;Dramtic Cycle Time Reduction – 3-system control delivers zero tool change time&lt;/li&gt;&lt;li&gt;Intelligent High Speed Spindle detects drill breakage by motor load, eliminates need for conventional mechanical detector&lt;/li&gt;&lt;li&gt;21 Tool Positions, 24 m/min Rapid Traverse Rate&lt;/li&gt;&lt;li&gt;Open Tooling Arrangement – rotary tools may be replaced by OD tool, off-center drill or front ID tool for flexibility&lt;/li&gt;&lt;li&gt;170 mm Stroke (Fixed Guide Bushing), 80mm (Rotary Guide Bushing)&lt;/li&gt;&lt;li&gt;Rapid Traverse Rate of 24 m/min – shortend idle and cycle times&lt;/li&gt;&lt;li&gt;Fanuc 16i-TB CNC&lt;/li&gt;&lt;/ul&gt;<br /><br />